11 June 2013

A Campaign for Real Architecture

I have long been of the opinion that we are on the threshold of a period of rapid and revolutionary change, which remains imminent, but also stubbornly illusive!  It is now over a hundred years since the birth of modernism, yet we continue to design most modern buildings in a style that has remained fundamentally unchanged over this period.

A thermally inefficient
 fully glazed office facade

The fully glazed façade remains the default answer for office and commercial buildings and is increasingly common in residential, hotels, schools and in fact anything that needs to be perceived by its target market as “premium” or “luxury”.  I have even had conversations with one very “blue chip” developer who insists that all their luxury housing is designed in a glass walled modern style.

It is almost as if the 1970’s energy crisis never happened; or that the climate change deniers have actually been proven to have been right all along!  We recently passed the significant threshold of 400 parts per million level for atmospheric CO2 yet still nothing changes.  There is now a detailed body of knowledge regarding envelope performance along with the potential for passive heating, cooling lighting and ventilation, yet the tyranny of the initial dumb image persists.

To accompany this lack of any real and concerted action there seems to have been an exponential growth in the rhetoric supporting sustainable development, with professional, repeat clients all arguing that this is the future while continuing to procure buildings from the past.  Now, while I accept that buildings take a long while to come to fruition, there is no evidence that I can detect, of any real or concerted change.

So what will be that catalyst that will trigger the sustainable architecture revolution?  The first shoots may well be the proliferation of groups that promote alternative metrics to measure building projects and promote sustainable development.  BREEAM and LEED are the most obvious of these but there is now a long and growing list including:


Recently, the Feeling Good Foundation was established, within the Building Centre Trust,  to research and promote how the built environment can be designed specifically to enhance the wellbeing of occupants.  One of the Foundations key objectives is to establish what constitutes value and what metrics should be used to measure wellbeing in the built environment.  I believe that this area represents the missing link and that once we are able to accurately assess the additional value that sustainable buildings create through improved occupant performance then we will finally be able to make a robust business case which shows a return on the investment required to deliver sustainable buildings through improved occupant productivity.

There are three areas that I believe are key to achieving the paradigm shift that is required if we are to ensure sustainable development becomes the norm.

People

The design process for all projects must place the wants needs and desires of building users at the heart of the process.  This will be a particular challenge for speculative developments where specific user groups are not known and is likely to drive innovation and the development of new building arrangements with more flexible and diverse spaces and environments.

Procurement

One of the most intractable barriers to sustainable development is the manner in which we buy buildings.  It is essential that we move away from lowest cost tendering to procurement systems that incentivise improved performance.  While there have been some isolated instances where this has been tested, most notably in the Building Schools for the Future programme the construction supply chain must be engaged to deliver better performing buildings and should be rewarded when this is achieved.  This would significantly change the nature of the process, placing more emphasis on design and encourage ongoing relationships between the construction industry and occupiers post completion.

Performance

It is essential that we understand how our existing building stock is performing so that investment can be targeted appropriately.  I would advocate that we should demand that all buildings must display their energy performance on a read out adjacent to the front door and that this data should be used to identify the best performing 25% of each building type with a green light, the middle 50% with an amber light and the worst 25% with a red light.  Imagine a street of houses where the good the bad and the ugly are made public; I am convinced that this really would make significant change happen extremely quickly!

There are two other factors that are required to create the necessary confidence for individuals and institutions to invest.  The Government needs to sets a clear policy framework to encourage sustainable development and then must show perseverance and not keep tinkering with it.  Unfortunately I suspect that this may be the biggest barrier of them all!

14 May 2013

Rebuilding Broken Britain

To create enduring value within our economy I believe that we need to radically change not only the nature of the buildings that we build, but also, the way that we procure them.  To achieve holistically sustainable buildings it is essential that the procurement process is intelligent and able to assess and reconcile the social, economic and environmental aspects of every project.  However, this is not currently the case, as is amply demonstrated by the current fashion for meaningless architectural “iconography” being built in the City of London.


These projects have all been procured by professional, repeat clients, who claim to take sustainability seriously.  So why are they all building painfully fashionable, contorted building forms that are expensive, spatially compromised, have thermally inefficient fully glazed facades with deep plans that are impossible to daylight?  They have no doubt been encouraged to take this path by senior planners in the City who make powerful recommendations as to which “starchitects” work they would like to see added next to the City’s architectural zoo.  I would argue that developers of these schemes have simply applied a green wrapper to their activities and continued with business as usual, rather than embedding sustainable development at the core of their activities.

To achieve the required paradigm shift, we need to select design team members for their demonstrable track record of innovation in the field of sustainable development.  Project specific briefs should be prepared and published that define what is to be built and what key performance indicators will be used to judge the success of completed projects.  These indicators must include annual occupant satisfaction surveys, operational energy expenditure along with maintenance expenditure, with outcomes made publically accessible: after all, most of these buildings ultimately become assets of our pension funds!

I believe that we need to arrest the decline in quality and fitness for purpose of development; where we can calculate the cost of everything but having little or no understanding of where construction creates value.  To be relevant we must sever the link between construction output and the creation of investment assets whose value bears little or no relation to the performance of the building.  The fact that we are still debating if a “green premium” or a “brown discount” exists is powerful evidence that we are unable to effective ascribe value to the products created by our industry.  In my opinion Quantity Surveyors are obsolete and should be retrained to become Value Managers, able to orchestrate and create enduring value for clients and the wider UK economy.  This would be a good first step in redefining the why that teams interact, smashing professional silos can be and remade to encourage the sustainable outcomes that are urgently required.

Intelligent procurement must incorporate local procurement, so that communities that experience development receive social and economic benefit from the process.  We must stop packaging up ever larger parcels of development and instead place more, smaller, lower value contracts with locally based small and medium sized companies (SME’s) to create more jobs and spread construction expenditure more equitably throughout the UK.  Local firms who will be forced to live with the products of their labours, whereas national or international builders are far less accountable to the communities who inherit the buildings that they deliver and where the value that is created by the process benefits remote shareholders rather than communities.

The idea of local procurement should I believe be taken further with the construction industry supporting locally manufactured building products and materials that also create jobs and value.  This philosophy needs to be incorporated at the brief stage, requiring design and delivery teams to embrace the notion of the final building being Made in Britain, with public reporting of the outcome.  This initiative could drive a fundamental socio-political shift, moving away from a reliance on services to create value, restoring the balance the in the UK economy by supporting manufacturing.

There is a strong belief that Design & Build is the best answer for most buildings and clients.  However, as the recession has continued to bite it is noticeable how the amount of “design” that is being undertaken by contractors has dramatically reduced.  It is essential that Project Managers undertake detailed analysis of tender returns, if clients are to get the buildings that they think that they are buying, rather than the best that the contractor can cobble together without the correct amount of timely, expert detailed design.

Large organisations are changing their terms and conditions, increasing the time that suppliers have to wait to be paid; contractor Carillion now expect suppliers to wait 120 days to receive payment.  This creates cash flow issues further down the supply chain and can result in small, well run companies going out of business.  Associated with this issue is the protracted nature of contractual negotiations, demands to agree to unfair and ultimately uninsurable terms and conditions, resulting in significant delay in the period from starting work to receipt of the first payment.  It is essential that the government takes urgent action to get the money moving and should start by insisting that all appointments are agreed prior to commencement and strict 30 days terms are mandatory.

We must increase investment in training and education to equip our workforce with the skill, knowledge and expertise required to add sustainable value, regardless of the individual’s role in the supply chain. Crucially, I believe that we need to invest in vocational training to radically improve skill levels within our sector and create a workforce who are able to deliver construction to the higher levels of performance required.  The industry must offer great career opportunities for all regardless of gender.

For the construction sector to once again become an engine for growth in the UK economy then investment must be focused not on iconic new build schemes but instead on the refurbishment of our existing building stock.  We urgently need to invest in improving the performance of our existing buildings now!  This will create jobs, establish the essential missing link between energy efficiency and energy supply, reduce our reliance on expensive imported energy and ultimately reduce the number and cost of the next generation of nuclear power stations that we will be forced to buy from aboard if we are to keep the lights on.

To rebuild broken Britain sustainably we need to radically change the things that we build, along with the ways that we procure them.  Professional boundaries need to be challenged and new bodies established.  I would argue that none of the existing professional bodies can provide the leadership needed and what we require is an Institution for Sustainable Development, open to all professions and their clients, which can effectively research, promote and lobby for change.

Localism should be reinterpreted to demand that the value created by development directly benefits the communities that host development, creating jobs and economic activity close to the site.  On a national scale we should develop a new vernacular architecture using materials and products that are Made in Britain, including the development of upcycled products that convert waste materials into new construction products and materials.  Fundamentally we need to understand, through compulsory Display Energy Certificates (DEC), how every building in the UK is performing and then use this intelligence to guide a national refurbishment mission to dramatically improve performance.

This piece was first published in Sustain Magazine May/June 2013

18 March 2013

Black Thoughts on Ecobuild

Well that’s ecobuild over for another year, and I for one say good!  In many ways I think that ecobuild reflects many of the barriers that are preventing our industry delivering the step-change that is required to address the pressing issues of our age.  As I walked around the vast, artificially conditioned interior of ExCel London what struck me most powerfully was the gap between presentation and reality.

Every product has
been greenwashed!
In the evolution of sustainable design I believe that we have really not changed much at all; all that has changed is the words that we use to describe products and the spin that is used to emphasise their virtues.  Ecobuild is dominated by major global construction product manufacturers and suppliers all of whom have added words like “eco” or “green” to the descriptions of their products and then, in the vast majority of cases, simply continued with business as usual.

The high cost of exhibiting at the show prevents most small companies and start-ups from displaying their wares, so almost all of the really interesting things that one found in the early shows, back in the good old days at Earls Court, have now disappeared.  For me to continue to make the annual pilgrimage to the Royal Docks, this must change.  I think that as the UK’s largest construction trade show there is a responsibility incumbent upon UBM, the franchises new owners to give something back, and this should be in the form of small low or no cost stands for small and medium sized enterprises (SME’s) and start-ups.

As a practice, we have an initiative called Product of the Month where we ask our team to identify innovative sustainable building products and materials.  On average we have noted that it takes at somewhere between 3 and 5 years for the products that we find to appear at ecobuild.  Clearly, this would be cut dramatically if they were able to exhibit at low or no cost.  Also, by gaining exposure sooner they are more likely to survive and thrive.


The international nature of the industry is reflected at ecobuild, with significant space given over to foreign firms, with a rapid growth in those coming from China.  Many contractors now boast about having their own global supply chain, able to source products direct from Chinese manufacturers, cutting out the middle men.  But is this really a sustainable model for the UK economy?

I passionately believe that we need to rebalance our economy by growing our manufacturing sector.  This is essential if we are to create the range of jobs that we need to achieve full employment and long term social cohesion.  Construction products and materials manufactured and sourced from the UK create jobs and ensure that value is created in the UK and not aboard.  Removing long distance supply chains also delivers easy cuts in embedded carbon, which is increasingly important as we cut operational energy.

Glabal trade,
large carbon footprint!
Local sourcing of construction labour will ensure that host communities benefit from the construction process, but I would like this principle extended.  Small and medium scale (SME) businesses create jobs locally and in greater numbers than large national or international firms.  I would like to see all state funded procurement favour local small businesses for all contracts below £5 million.  Locally designed and built projects will help reconnect the property industry with the communities that we should be serving, correcting the distortions that have occurred due to property being seen primarily as an investment asset class rather than a means of enhancing the efficiency and wellbeing of building occupiers.

There is a pressing need for radical change to make the construction industry relevant and capable of addressing the concerns of our age.  The future must be small, local and accountable if we are to deliver intrinsically sustainable development.

11 February 2013

Re-Imagining Design and Embedding Sustainability

Sustainable design is something that all architects do now; right?  It’s on every practices website, included in all their presentations and has been totally integrated into the way all buildings are designed.  Even the RIBA is now belatedly “on message”, promoting the idea that buildings should be designed to be sustainable.
 
Mies van der Rohe glass skyscraper
 concept designed in 1919
 So, how come the buildings that we are constructing now have not changed significantly since the birth of modernism almost one hundred years ago?  Mies van der Rohe published his revolutionary concept for a glass clad skyscraper back in 1921 and you could argue that we have been repeating this typology, with only minor amendments, ever since.  Is the Shard not just a less efficient more compromised variant of this underlying philosophical position?

What has changed is the rhetoric that accompanies each of these increasingly contorted iconic projects; all of which claim to be exemplars of sustainable development.  Clearly, it is not only architects who are guilty of not walking the talk when it comes to sustainability; developers, funding institutions, governments and local authorities are all rebranding their particular form of “business as usual” in a new recycled paper wrapper!

Renzo Piano all glass
 Shard nearing completion 2013
 It is my strongly held belief that this incremental improvement approach is no longer sufficient and what is required is a fundamental reappraisal of why, what and how we build.  In short, I believe that we are about to enter a period of rapid and revolutionary change that will result in re-imagining design and the development of an entirely new Sustainable Architecture, shaped by an understanding of the challenges that we face and therefore directly relevant to the concerns of our age.

To achieve the necessary paradigm shift we must challenge some deeply ingrained behaviours and beliefs and fundamentally re-evaluate the reasons why we build at all. This process must start by placing social sustainability and needs of building users at the heart of the design process.  It is no surprise that the best examples of sustainable design are conceived when the building’s users are known before design commences.  Also the greatest value that a building design can create is not in energy savings but in helping to improve the productivity of the people who work in them.  To achieve this added value it is essential that buildings are designed from the inside and the needs of the user out.  This philosophical approach creates massive opportunities for creativity and innovation, once the dead hand of style is rejected, in favour of a new sustainable building aesthetic where each design decision is directly informed by its social, economic and environmental issues.

Our CAFOD project, that I will be presenting at the UKGBC’s Re-Imagining Design course on the 27th February, is a good example of this approach.  The key aspect of the project’s evolution was that we did not win the commission with an image of a completed building, but instead explained how we would assist them, as a non-expert client, to develop a bespoke; user centred sustainable solution, shaped to fit their immediate needs and facilitate organisational change.

Black Bio Climatic office
 tower concept 2005
This approach is in stark contrast to the vast majority of speculative commercial buildings, which are conceived primarily as investment assets and whose appearance and architectural style are determined at inception.  This procurement process, I would argue, results in the current fashion for more and more contorted building forms, as design teams strive to make the most remarkable, arresting images, rather than the most sustainable designs, to secure commissions.

If we are to make the UK’s building stock more sustainable I believe it is essential that funding institutions only agree to invest our pension contributions into demonstrably sustainable buildings.  This will change overnight what gets commissioned, since developers want to be able to sell their completed developments so that they can reinvest profits into the next development opportunity.  It will also result in less risk and more predictable returns for the funds, since sustainable buildings will either command a “green premium” because they are more desirable or at worst will not experience a “brown discount” due to their increased occupation costs.

In re-imagining design I believe that we need to place social sustainability at the heart of the design process, with the explicit intention of delivering buildings that create value by demonstrably improving the performance of the people who occupy them. This philosophical shift will finally close the cost benefit gap that makes investing in higher performance difficult to justify.  Over time the quality and value of the UK’s building stock will increase, creating value and safe guarding the investments that ultimately fund our retirement.  A paradigm shift of this magnitude will create a New Sustainable Architecture that is relevant and valuable.  As Mies van der Rohe put so succinctly;

“Architecture is the will of an epoch translated into space”

Surely the will of our epoch calls for urgent, radical change; re-imagining design to deliver buildings that create enduring value for the people who use them, the organisations that own them and the society that they are part of.

Don’t delay, the future starts today!

30 November 2012

Phoenix HQ November Update


This is the second of an on-going series of blogs that aim to create a photographic log of the construction process at the Phoenix HQ.
At the end of October (click here to view previous blog) a couple of bays had been erected and we could look forward to the completion of the first half of the frame by the end of the month.
Site visit 01.11.2012

When we next returned to site at the beginning of the month the first half of the composite frame had been erected and the construction team were starting preparation for the first floor’s metal deck to be laid.
 
Site visit 08.11.2012

One week later the metal deck was down, and for the first time we were able to gain access to the first floor. At this point the scale of the spaces had started to become more apparent and we were able to envisage how it will feel when the building is in use.
 
 
Site visit 20.11.2012
 
After a two week absence from site the concrete for first floor slab had been laid and work is currently progressing with attaching the SIPs to the composite frame, although there have been some delays due to high winds.
 
Site visit 22.11.2012
 
Phase II of the frame started on the 26th of November and will be complete within the next 3 weeks, when the overall mass of the building should become clearly visible. Concurrent with this, the blockwork is due to commence on the ground floor any day now and the layout of the public spaces and lift shafts will start to take shape. This should all be complete by the 6th of January when first fix is due to commence. 

2 November 2012

Phoenix Community Housing HQ Underway

From this month forward we will be posting monthly updates on the progression of Phoenix HQ as it is constructed. Since the last blog the project has been through planning and Osborne has been appointed as the contractor. The updates will aim give a visual log of the projects construction process.


Ground floor slab cast
Site being prepared for
foundations















By the beginning of the month the Greenman Pub had been demolished and the site cleared. During the first and second weeks the foundations and slab were laid out and completed.

Glulam frame manufactured
in Austria
Hockey stick beams
ready for delivery














Whilst this process was occurring on site in the UK, B&K Structures had the timber frame manufactured by Kaufman in Austria.


Frame erection
commenced on site
First structural bay
nearing completion















The frame arrived on site on the 22nd of the month and the team on site immediately started erection.
The view of the site from the Bromley Road

The completion of Phase 1 of the composite timber frame will be Monday 5th of November and Osbourne will start laying the concrete deck immediately. The SIPS panels are due to arrive on site by the 12th of November.  The installation of the SIPs is due to take 2 weeks so that by the time of the next update, Phase 2 of the structure will have commenced.

4 October 2012

BOB 3: Ethical + Fiscal = Inevitable

A group of carefully selected building industry leaders recently gathered for the latest Breakfast on Black held at The Fire Station in Waterloo.  After a hearty breakfast guests were treated to an informative and challenging presentation from Richard Francis, Director of Sustainability at Gardiner and Theobald. 

Richard Francis
Director of Sustainability
Gardiner and Theobald

Richard’s presentation “Ethical + Fiscal = Inevitable” was delivered with his trademark combination of transatlantic easy style and powerful analysis of the challenges facing the construction industry.  His presentation was split into four sections coving both the immediate drivers for change along with those that he has identified as looming just beyond the horizon.  He neatly summarises the journey ahead as the progression from beauty pageant to talent show, illustrating the need for evidence based decision making along with more intelligent procurement.

Drivers

Richard started by identifying the proliferation in regulations that are being developed to try to achieve more sustainable outcomes.  He made the point that when looked at as a whole there are some key facts that can be identified; that the direction of regulation is to encourage disclosure which leads to transparency and that transparency is essential to allow a market to be created.

The market that is emerging is characterised by wider choice, with smarter occupiers demanding shorter leases and more flexibility.  He posed the question as to why the property industry insists on using outdated names like “landlord” and “tenant” rather than “supplier” and “customer”; questioning if changing names would help to encourage improved quality and higher standards of aftercare.

He reviewed the current state of the market and identified that there has been a dramatic growth in the amount of available second hand property on the market which has increased from about 3 million square feet in 2000 to over 13 million square feet by 2011.

When investors, developers and occupiers are asked to identify the drivers that they believe will lead to property becoming obsolete in the next 5 years, they all identify energy efficiency as either the first or second most likely cause.

Change

Richard characterised the market as in a state of rapid and multifaceted change, with buildings increasingly being judged on how they perform, with savvy occupiers scrutinising certifications like BREEAM and LEED assessments and demanding evidence that actual performance in use is as predicted before they are willing to sign-up.  He sees a growing trend that is moving away from simply quantifying cost to growing importance placed on assessing value.

He illustrated this trend with the fact that 10 years ago it was hard to define, measure or value green buildings, but that over this period specialist knowledge relating to sustainability has become more generally accepted and that this has lead to a transformation of the market as a whole.  He illustrated this point with a quote from Jones Lang Lasalle 2011 Perspectives on Sustainability report:

“Five years ago, a corporate real estate executive might have thought sustainability was a costly way to make the company look good to employees. Two years ago, that same executive probably focused on energy management as a way to save money in the short run. Today, he or she may be pursuing green strategies that enhance employee productivity”.

For most companies, property costs are normally amoungst their top three highest costs, along with those associated with employing their personnel.  In striving for value it is essential that the effect that building design has on occupant behaviour is more deeply understood.  Richard made the powerful point that people are the crucial, but until now overlooked, economic component of sustainability.

He reinforced this with the 90% rule; namely that 90% of most organisations environmental impacts come from property occupation, that 90% of most individuals working life is spent indoors and that 90% of whole life costs can be directly attributed to their personnel.

When senior executives are asked about the relationship between productivity and sustainability over 2/3 of respondents expect more sustainable buildings to facilitate their people being more productive, and that these productivity gains represent the largest potential economic benefit that sustainable buildings can deliver.

Economics

While Richard acknowledged that the notion of sustainable buildings commanding a premium is difficult to prove, there is he contends a growing body of evidence that this may be the case.  He presented data drawn for the UK, Europe and the US which quantified this “green premium” at somewhere between 3 and 8%.  He also explored the notion of a “brown discount” where poorly performing stock is financially penalised by the market; demonstrating that increased energy costs could account for as much as £3.00 per square foot.

He posed the question if this approach were applied to occupant productivity what would that do to the value of the best and worst performing examples?  As CBRE identified in their 2011 publication "Sustainability the Great Differentiator", a 10% increase in performance could easily equate to added values equilivalant in many cases to an organisations total rent.  Richard went on to highlight that total staffing costs equate to 10 times total property costs (design, build, operate and maintain) for a building with a typical 30 year lifecycle.

Next Steps

Richard concluded his presentation with his take on what the future may look like. He challenged the way buildings are valued, based on historic performance and taking little or no account of performance in use or wider sustainability issues.  He expressed his opinion that due diligence processes are being adopted by many larger occupiers to properly assess buildings and that this approach provide a good indication of the likely direction of travel of the industry as a whole.

He explored the subliminal messages that property performance conveys about brands and how this association is likely to drive increasing demands for higher performing buildings that reflect wider brand values.  He asked why should customers trust companies who cannot manage their assets and people well and by implication why should they be trusted with our resources?

In thinking about what a brands building says about the way they value their people Richard made the connection between a commitment to sustainability and the ability to build loyalty, engagement, efficiency and pride among its workforce.  As Richard put it:

“if you think it is just about the building, you are missing a giant opportunity”

He finished off his inspirational presentation with a checklist of key actions that should be adopted to ensure more sustainable outcomes:

•         Recognise the importance of performance
•         Understand the limitations of existing standards
•         Think beyond compliance
•         Understand how buildings enhance mission
•         Realise that items with the greatest benefits often have the least costs
•         Anticipate change by reverting to principles

I am left thinking that there is a serious disconnect in the property industry that is directly created in the way that buildings are viewed primarily as investment vehicles and not great place for people to inhabit.

You would have thought that risk averse property investment funds would attach enhanced value to lower risk, more sustainable buildings, however to date this has not been the case.  Similarly, occupiers must demand buildings that can demonstrate that they have been conceived specifically to enhance occupant performance.  Finally, developers must select design teams who can demonstrate that they approach their work from a “user centred” philosophical perspective. 

15 June 2012

Renzo and His Piano

Razia and Renzo at RIBA
The evening at the RIBA began well last night as Angela Brady the President making a slip of the tongue and introducing him as “Renzo and his Piano”!  What followed was the first in a series of interviews conducted by Razia Iqbal to be broadcast on the BBC World Service under the title of Dream Builders.  The extended interview format was split into sections with questions from the audience after each section.  This led to a rather fragmented event lasting almost two hours, which never really got to the heart of what makes Renzo Piano tick.

The first section and recurrent theme of the evening was The Shard, with a short film exploring the building and interview with the buildings developer client Irvine Sellar. He told us that when first approached to design a tower, Piano was reticent about undertaking the commission as he thinks that they are usually “phallic and undemocratic”!

The interview that followed set the tone for the evening, with Razia asking a series of not too taxing questions and then allowing Renzo to provide long, poetic, but rather thin answers.  We learned that he thinks natural light is good, lightness a virtue, machines are sexy and transparency essential.  A lot was made of The Shard being a “vertical village” incorporating retail, office, restaurants, hotel and residential uses, along with a public viewing gallery and topped with London’s highest meditation space, which can also cater for up to forty well heeled private function guests.

Piano described the scheme with lyrical prose, as being highly democratic, making a significant contribution to the urban environment and how the words “civic” and “civilised” are virtually the same in Italian.  I am not sure how democratic luxury shops, restaurants and hotels really are, but swanky flats and offices definitely are not!  Sure, it is great to get elevated views over a city from a public viewing gallery, but this can often be experienced by the punter as a long, segregated queue in uninviting left over spaces that are kept out of sight of the beautiful people who the building is really designed for.

Typicl office plan with north point
Sustainability was briefly touched on, with the justification of the all glass façade being that it is triple glazed, with interstitial blinds that automatically close when the sun hits the various splinters that form the envelope.  Piano talked about lightness of the construction but this was really about the visual lightness of the façade than the actual weight and related embodied energy of the structure, made with an enormous amount of concrete.  He claimed that The Shard is the most sustainable tower in the world but did not back up this audacious claim with any evidence.  I was left with the impression that, as with so much in architecture at present, you must tick the sustainability box, but there is no need to let it interfere with how the building is designed.

Following on from The Shard the discussions became more philosophical, with Renzo talking about the size of his organisation and the way they approach their work.  Interestingly he does not see big as beautiful and has imposed a limit of one hundred people so that he can oversee, but not control the output of his office. 

Images of his breathtaking studio, situated on a cliff overlooking the sea outside Genoa appeared on the big screen, along with pictures showing the great man at the helm of his luxury yacht Kirribilli, creating a picture of someone with a very pleasant, if rather suburban lifestyle. 

Richard Rogers was in the audience and it occurred to me that in both his work and the way he organises his practice he is much more engaged with the urban realm.  Rogers work in cities has built upon the ideas behind The Pompidou Centre or as Piano and Rogers refer to it Beaubourg, while Piano’s later works are more aloof, read as objects rather than integrated pieces of the city. When asked if they were to collaborate on another project in the future, what they would like to do, Piano suggested a tower, which Rogers discounted, instead suggesting a Piazza.

After the event I was left thinking that The Shard was a bit of a missed opportunity.  In theory the mix of uses, the context of the site and its adjacency to a major transport hub and the size of the budget should have delivered something remarkable, but this opportunity is I believe frustrated by the tyranny of the image and iconography of the shard as an idea.


Menil Collection

I am left with many questions.  Why are all of the different uses treated with the same elevational response?  What richness would have been created if the programme had been made apparent on the exterior?  How could solar aspect and orientation have informed the design of each of the surfaces?  Is a narrow tapering form really the most appropriate shape to try to fit such a wide range of different user groups and activities within?


Jean Marie Tjibaou Cultural Centre

I have always had a great respect for the work of The Renzo Piano Workshop and their approach, creating intelligent, beautifully crafted, simple elegant modern architecture.  Their Menil Collection and Jean Marie Tjibaou Cultural Centre are highlights, shaped to respond to and manipulate the external environment to condition and regulate the interior, adopting bio-climatic design principles that directly govern the appearance of the completed buildings.  It would have been great if this approach had been taken in London, then we really would have had a relevant, provocative addition to our city.